INSTALLATION

Deck Clic™ is designed to provide easy and hassle free installation that does not require any elaborate tool or equipment. Deck Clic™ products provide flexibility for self-assembly without need for major refurbishing which eliminates the need for application of consent from local housing authorities.
Deck Clic™ unique modular design is quick to install and easily customizable for irregular floor designs, challenging corners and uneven base. The DIY customization can be achieved by sawing off excess material to accommodate perfect fit.

 
   

STAGE 1

Measure the floor surface intending to be covered (length and width dimensions). Input the measurements into Deck Clic™ Modulator ™ available in this website to derive at estimated units of Deck Clic™ needed.

 

 
     
 
   

STAGE 2

Installation of Deck Clic™ should commence from the outer most corner of the intended area. Lay the first module and attach an adjacent module by affixing the linking pins into the slots of the previous unit.

 

 
     
 
   

STAGE 3

Follow stage 2 assembly instruction consecutively, until the entire intended area has been covered effectively.

 

 
     
 
   

STAGE 4

The tiles are ready for surface finishing. The floor must be coated with decking oil immediately after laying; if this is not done, the wood could oxidize, turning grey or darken in color.

 

 
     
 
   

STAGE 5

To customise Deck Clic™ for irregular corners, simply cut the module into desired shape using handsaw or circular saw. Factory fitted screws are to be removed prior to the cutting of the module and should be replaced at appropriate slots on the remaining area subsequently, to ensure that all wooden area are firmly attached to the base.

 

 


MAINTENANCE
 

To maintain the appealing appearance and protect the integrity of the timber decking, it is vital to take simple steps to retain the deckings’ optimum performance and durability every 6 months.

STEP 1
Rinse all timber to be treated, with running water to remove dirt and oil from surface and allow to dry. For deckings that are painted, sanding is required to restore to the original bare timber before cleaning.

STEP 2
Ensure the timber protective oil is well mixed before application. Apply the oil generously using a good quality brush to coat the wood slats with the oil thoroughly. Use multi-directional strokes to ensure all grains are evenly treated. Work the oil into the timber and let it set for a few minutes before proceeding to wipe off the excess oil and allowing to dry.

STEP 3
Allow 18 hours of drying time* between coats. (*Low temperature and high humidity days require longer drying intervals.)

STEP 4
Apply second coat of oil, repeating similar process as described in step 2.